The Missner Group Completes Construction of Mixed-Use Development in Glen Ellyn

The Missner Group is pleased to announce they have completed construction on GSP Development’s Apex 400 Apartments, a ground-up, luxury, multi-family apartment, and retail property, located in the heart of downtown Glen Ellyn, Illinois. The property features 10,000 square feet of first-floor commercial space, joined with 107 luxury apartment units on the second through fifth floors.

Apex 400’s units will include studio and convertible units, as well as one and two-bedroom apartments. Each residential unit will feature the highest level of comforts, including outdoor balconies, in-unit washers and dryers, state-of-the-art appliances, granite countertops, security systems, and walk-in closets.

Communal amenities will include an outdoor rooftop swimming pool, recreational area with a perimeter walking path, entertainment room, business center, yoga studio, and a fitness facility.

A two-story parking garage will incorporate public parking on the first floor and residential parking on the second floor. The parking area intended for public use replaced the existing parking area on the site and includes 137 public parking spaces.

The project team included Missner Group COO Bob Nomellini, Bob Papineau, senior project manager, Don Hay, Assistant Project Manager, Keith Hairrell, senior project superintendent, and Andrew Maul, project superintendent.

“We enjoyed working on this luxury facility and are proud to deliver a product of superior quality to Glen Ellyn’s strong market,” says Papineau. “Our team adhered to high site safety standards, which allowed us to safely progress through the many pandemic disruptions.”

Apex 400 is centrally located in the heart of the vibrant downtown Glen Ellyn commercial district within close proximity to Metra along with other forms of public transportation. Apex 400 is ideally located close to the surplus of amenities available in the downtown Glen Ellyn - with many within walking distance.

Apex 400 Apartments opened for occupancy on June 1, 2022.

Previous
Previous

The Missner Group Hires Schimmel as Director of Property Management

Next
Next

The Missner Group Breaks Ground In Melrose Park On Behalf of Bridge Industrial